Update on Cabin 13 and 14 at Camp Li-Lo-Li

Work continues on the remodel of Cabin 13-14. So much has happened since our last blog post! This double cabin has been re-framed, and now has a new metal roof, new fascia and soffit.








The new porch was added to bring it into line with the other new cabins and concrete pad was installed out front. I can already picture campers enjoying their early morning devotions on this porch!
 
The doors and windows are in and now work has begun on the interior. The electrical has been installed and inspected and the ceiling has been installed.








This past weekend the youth group from Northgate Bible Chapel pulled up the old floor to gain access to the crawl space and to prep for the new floor that will eventually go in.


Thanks to all who have worked so hard on this project. It is going to be a great addition to the camp!